92 Metres Per Shift

Posted on May 10, 2017 by DET CRC

RoXplorer® on site during the recent Port Augusta field trials.

RoXplorer® CT Rig drilled 367 metres drilled in four consecutive 12 hour shifts at an average of 92 metres per shift.  This compares with around 25 metres per shift diamond drilling in the adjacent hole.